Hi all.
New on here with Macan S on order. Received this from dealer showing previous timescale (on left) and new on right, but puzzled as dates shown all 6/5/22. Any ideas?
Not getting any feedback from the dealer.

Think it might just be a case of wait and see. Anyone had this before?

Screenshot_20220424-073649_Gmail.jpg

Col Lamb
Posts: 9323
Joined: Fri Oct 30, 2015 8:38 pm
Location: Lancashire

Post by Col Lamb »

Welcome.

Firstly you did well to get that, mostly the OPC’s are tight lipped and quote Not Policy to release such data.

Dates are not fixed in stone at any time and the V312 to V331 period of 7 days is a best guess as is the actual build which has typically been 3 days.

Entry and exit of compound on the same day, very unlikely.

The second column looks to indicates a predictive commencement date and that an arbitrary date goes in but is not flagged as active hence the remaining cells fill with said date.

Have you locked down your specification?
Col
Macan Turbo
Air, 20” wheels, ACC, Pano, SurCam, 14w, LEDs, PS+, Int Light Pack, Heated seats and Steering, spare wheel, SC, Privacy glass, PDK gear, SD mirrors, Met Black, rear airbags
TK421
Posts: 519
Joined: Thu Sep 16, 2021 10:58 am
Location: England

Post by TK421 »

Edp70 wrote: Sun Apr 24, 2022 7:45 am Hi all.
New on here with Macan S on order. Received this from dealer showing previous timescale (on left) and new on right, but puzzled as dates shown all 6/5/22. Any ideas?
Not getting any feedback from the dealer.

Think it might just be a case of wait and see. Anyone had this before?
Would also be interested in knowing when you placed your order. ;)
23 Macan GTS
EX - 22 Macan GTS

The final Hurrah http://www.porsche-code.com/PRSB8KW7
Jon A
Posts: 4375
Joined: Tue Oct 19, 2021 7:26 pm

Post by Jon A »

This was mine and shows three dates - planned, expected and actual.

CCB3B24B-1B85-4DDF-9408-A429DB1AF6DC.png

718 Boxster - lava orange (2019)
992 C2 racing yellow (2020)
https://configurator.porsche.com/porsche-code/PRIMAJB4
Ex - Macan S - Carmine (2022)
http://www.porsche-code.com/PNZVYTE0
Edp70
Posts: 7
Joined: Sun Apr 24, 2022 7:20 am

Post by Edp70 »

Cheers Jon.
Placed order 26 August.
Been delayed due to supply of wiring harnesses (Ukraine I believe)
Interesting that you get a full breakdown.
BanZ
Posts: 897
Joined: Wed Sep 08, 2021 1:43 pm

Post by BanZ »

Edp70 wrote: Sun Apr 24, 2022 10:19 am Cheers Jon.
Placed order 26 August.
Been delayed due to supply of wiring harnesses (Ukraine I believe)
Interesting that you get a full breakdown.
I got the same. You have to badger your SE a bit though and quote the numbers that you want to see in my experience. They emailed me screen grabs of their ordering system.
Edp70
Posts: 7
Joined: Sun Apr 24, 2022 7:20 am

Post by Edp70 »

Thanks Col Lamb.
Spec was locked down 28.03.
That's what I thought regarding 06.05 for commencement and not port entry date
Edp70
Posts: 7
Joined: Sun Apr 24, 2022 7:20 am

Post by Edp70 »

Thanks TK421. having some teething issues tracking the threads on here :)
Order placed 26 August
Edp70
Posts: 7
Joined: Sun Apr 24, 2022 7:20 am

Post by Edp70 »

Thanks Banz.
Yep probably right :)
GTB
Posts: 541
Joined: Thu Aug 26, 2021 3:49 pm
Location: Scotland

Post by GTB »

Hi Edp70,

I placed my order 1st September 2022, received detail screenshot below two weeks ago from my OPC,

Pic 1.jpg

So looks my planned completion date exactly a week after yours.

Cheers GTB
Current Macan GTS Collected July 2022 https://www.porsche.com/microsite/porsc ... =/PNM4GBM0