Hiker1 wrote: ↑Mon May 30, 2022 8:17 pm
Further delay!
My Macan-S should have been delivered to the dealership on 3/6/22, but after sitting in the Porsche compound in Leipzig for twelve days was selected “for further quality checks” according to the SE. It is now due at the dealership around 17/6/22. Deposit on the car was paid mid-September. Configuration PNTHIAX6.
I ordered and paid my deposit mid-September also. The build completed just before the 14th May and was on it’s way to Emden on the 14th May. It then arrived in the UK this weekend and I believe it’s now sitting at Grimsby waiting to be transported down south. No indication when it will be ready to collect yet so currently waiting for a phone call from my SE.
I’m not sure how long it will take now but I’m guessing that it might be ready to collect the week after the long weekend. I would love to be able to pick it up this week ready for the long weekend but sadly it’s not likely.
Hiker1 wrote: ↑Mon May 30, 2022 8:17 pm
Further delay!
My Macan-S should have been delivered to the dealership on 3/6/22, but after sitting in the Porsche compound in Leipzig for twelve days was selected “for further quality checks” according to the SE. It is now due at the dealership around 17/6/22. Deposit on the car was paid mid-September. Configuration PNTHIAX6.
Had exactly the same conversation with my SE last week, stuck in compound for 2 weeks, then ‘further quality checks’, whatever they are! Now also due at dealers by 17 June and on order since early Sept. Won’t believe it until I actually have the keys in my hand
Hiker1 wrote: ↑Mon May 30, 2022 8:17 pm
Further delay!
My Macan-S should have been delivered to the dealership on 3/6/22, but after sitting in the Porsche compound in Leipzig for twelve days was selected “for further quality checks” according to the SE. It is now due at the dealership around 17/6/22. Deposit on the car was paid mid-September. Configuration PNTHIAX6.
Similar logistics profile to mine. I reckon they just spout rubbish because that's what car salesmen (forget the Sales Executive claptrap) do. It's ingrained, the first lesson they're taught is "Bull$hit Baffles Brains"
So I received a message yesterday, GTS Order placed end of August 2021, build allocation for November 2022.
Quite a bit later than I anticipated originally but with all the things going on, I suppose I should be happy that I have a slot.
Sold : 2012 981 Boxster S
Sold : 2016 981 Boxster Spyder
Sold: 2017 pdk 718 Cayman S
Sold : 2022 718 Cayman GTS 4.0 pdk PNPZ3NJ9
Sold : 2022 Macan GTS PP6I14Y4
Current: 2018 Gen2 Macan Base (hers)
Due 2023 718 Spyder PPFDEYX7
Gibberish wrote: ↑Sat Jun 04, 2022 11:03 am
So I received a message yesterday, GTS Order placed end of August 2021, build allocation for November 2022.
Quite a bit later than I anticipated originally but with all the things going on, I suppose I should be happy that I have a slot.
Man that's a long wait. I ordered mine the month before you and took delivery in mid March
Gibberish wrote: ↑Sat Jun 04, 2022 11:03 am
So I received a message yesterday, GTS Order placed end of August 2021, build allocation for November 2022.
Quite a bit later than I anticipated originally but with all the things going on, I suppose I should be happy that I have a slot.
Man that's a long wait. I ordered mine the month before you and took delivery in mid March
Tell me about it.. I was hoping for a July build September delivery.
I have a Cayman GTS arriving in July and only planned to keep it 2 months then move it on which is still the plan.
Just need to come up with a car for September to December, looking into short term leasing as the car will be doing 1k miles per month from September.
Apparently my Opc hasn't had many GTS allocations, frustrating but kind of stuck in a catch 22.
Sold : 2012 981 Boxster S
Sold : 2016 981 Boxster Spyder
Sold: 2017 pdk 718 Cayman S
Sold : 2022 718 Cayman GTS 4.0 pdk PNPZ3NJ9
Sold : 2022 Macan GTS PP6I14Y4
Current: 2018 Gen2 Macan Base (hers)
Due 2023 718 Spyder PPFDEYX7
Gibberish wrote: ↑Sat Jun 04, 2022 11:03 am
So I received a message yesterday, GTS Order placed end of August 2021, build allocation for November 2022.
Quite a bit later than I anticipated originally but with all the things going on, I suppose I should be happy that I have a slot.
Man that's a long wait. I ordered mine the month before you and took delivery in mid March
Tell me about it.. I was hoping for a July build September delivery.
I have a Cayman GTS arriving in July and only planned to keep it 2 months then move it on which is still the plan.
Just need to come up with a car for September to December, looking into short term leasing as the car will be doing 1k miles per month from September.
Apparently my Opc hasn't had many GTS allocations, frustrating but kind of stuck in a catch 22.
So you'll have one of the first 2023 registered cars I guess?
Man that's a long wait. I ordered mine the month before you and took delivery in mid March
Tell me about it.. I was hoping for a July build September delivery.
I have a Cayman GTS arriving in July and only planned to keep it 2 months then move it on which is still the plan.
Just need to come up with a car for September to December, looking into short term leasing as the car will be doing 1k miles per month from September.
Apparently my Opc hasn't had many GTS allocations, frustrating but kind of stuck in a catch 22.
So you'll have one of the first 2023 registered cars I guess?
I guess it will be the first batch 2023 cars, so there's always a silver lining, the Macan will be replaced mid 2023 if all goes to plan with my 992 C T order.. if it doesn't I'll just keep it longer.
Sold : 2012 981 Boxster S
Sold : 2016 981 Boxster Spyder
Sold: 2017 pdk 718 Cayman S
Sold : 2022 718 Cayman GTS 4.0 pdk PNPZ3NJ9
Sold : 2022 Macan GTS PP6I14Y4
Current: 2018 Gen2 Macan Base (hers)
Due 2023 718 Spyder PPFDEYX7
Gibberish wrote: ↑Sat Jun 04, 2022 11:03 am
So I received a message yesterday, GTS Order placed end of August 2021, build allocation for November 2022.
Quite a bit later than I anticipated originally but with all the things going on, I suppose I should be happy that I have a slot.
Which OPC is this with? I thought if you get build allocation now then car would be built before November surely?
Macan GTS on order: http://www.porsche-code.com/PPDF6163
Ordered 25th Aug 2021 - Build slot August 2022, Landed in OPC - 29th September 2022 - Collected 29th November 459 days since ordering!