No, my SE didn't know why there was a problem. He was just reading the estimated dates. Could be a surge in UK deliveries after the March shutdown.Old Chimer wrote: ↑Thu May 26, 2022 6:47 pmCan't find anything online to explain this. Any idea what the 'blockage' is?Bluesnose1812 wrote: ↑Thu May 26, 2022 2:53 pm Bad news from my SE. Cars are blocked at Sheerness and my ETA has been delayed for two weeks. They have 30 cars at the port waiting for delivery to Tewkesbury.
Meanwhile, Parana appears to be heading to an anchorage off Maidstone, so presumably no room to either dock or offlload at Sheerness. You really couldn't make it up, could you
Edited to add: Parana picking up speed again so maybe just an issue over timing of arrival for berth availability or tide time.
Build allocations only
-
- Posts: 1628
- Joined: Sat Sep 18, 2021 1:16 pm
- Location: Worcestershire
Currently
S|Leather|Air Susp|Chrono |Surround Camera|BOSE|14 way | AILPG |
http://www.porsche-code.com/PPSV6RD5
Next Project GTS March 2025
https://configurator.porsche.com/porsche-code/PR8DH6E6
S|Leather|Air Susp|Chrono |Surround Camera|BOSE|14 way | AILPG |
http://www.porsche-code.com/PPSV6RD5
Next Project GTS March 2025
https://configurator.porsche.com/porsche-code/PR8DH6E6
-
- Posts: 440
- Joined: Mon Oct 18, 2021 9:42 am
Okay, cheersBluesnose1812 wrote: ↑Thu May 26, 2022 7:26 pm No, my SE didn't know why there was a problem. He was just reading the estimated dates. Could be a surge in UK deliveries after the March shutdown.
'22 Macan S, GB, 14W/XL, AAS, PA/SV, ACC, LCA, PG, HF/RS, VFS, EETS, 75L, etc, etc.
My SE informed me it was a customs thing.Old Chimer wrote: ↑Thu May 26, 2022 7:33 pmOkay, cheersBluesnose1812 wrote: ↑Thu May 26, 2022 7:26 pm No, my SE didn't know why there was a problem. He was just reading the estimated dates. Could be a surge in UK deliveries after the March shutdown.
-
- Posts: 440
- Joined: Mon Oct 18, 2021 9:42 am
-
- Posts: 1628
- Joined: Sat Sep 18, 2021 1:16 pm
- Location: Worcestershire
Probably due to thisas7920 wrote: ↑Thu May 26, 2022 8:31 pmMy SE informed me it was a customs thing.Old Chimer wrote: ↑Thu May 26, 2022 7:33 pmOkay, cheersBluesnose1812 wrote: ↑Thu May 26, 2022 7:26 pm No, my SE didn't know why there was a problem. He was just reading the estimated dates. Could be a surge in UK deliveries after the March shutdown.
https://www.kentonline.co.uk/sheerness/ ... es-266616/
Currently
S|Leather|Air Susp|Chrono |Surround Camera|BOSE|14 way | AILPG |
http://www.porsche-code.com/PPSV6RD5
Next Project GTS March 2025
https://configurator.porsche.com/porsche-code/PR8DH6E6
S|Leather|Air Susp|Chrono |Surround Camera|BOSE|14 way | AILPG |
http://www.porsche-code.com/PPSV6RD5
Next Project GTS March 2025
https://configurator.porsche.com/porsche-code/PR8DH6E6
I've just been told that my car is on a boat right now due to arrive over the weekend. This means that it must be on the Schelde Highway or the Neckar Highway heading to Grimsby which is odd considering it will be heading to an OPC in the south. Oh well the main thing is that it's on the way and also it will avoid the possible delays at Sheerness.
First Porsche ordered September 2021: http://www.porsche-code.com/PNLRZA37
Build completion 14th May. Collected 30th June. Macan S Volcano Grey
Build completion 14th May. Collected 30th June. Macan S Volcano Grey
-
- Posts: 440
- Joined: Mon Oct 18, 2021 9:42 am
Turns out mine arrived in Sheerness on the Danube Highway last week
'22 Macan S, GB, 14W/XL, AAS, PA/SV, ACC, LCA, PG, HF/RS, VFS, EETS, 75L, etc, etc.
Hey Old Chimer - I think I spotted in one of the preceding 60+ pages of posts that you ordered from Portsmouth OPC? Just checking as I ordered a week after you and haven't got an allocation yetOld Chimer wrote: ↑Thu May 12, 2022 3:21 pm Getting back on topic, CP0.0 for mine was yesterday (actual) and CP8.0 is now expected next Monday.
Ordered 19/10/21
2023 718 Cayman GTS 4.0 (Porsche Code PRZ7RJN9)
Sold: 2023 Macan S Gentian Blue (Porsche Code PP6NHQK0)
Sold: 2021 Macan S Volcano Grey (Porsche Code PL2HKD85)
Sold: 2023 Macan S Gentian Blue (Porsche Code PP6NHQK0)
Sold: 2021 Macan S Volcano Grey (Porsche Code PL2HKD85)
Further delay!
My Macan-S should have been delivered to the dealership on 3/6/22, but after sitting in the Porsche compound in Leipzig for twelve days was selected “for further quality checks” according to the SE. It is now due at the dealership around 17/6/22. Deposit on the car was paid mid-September. Configuration PNTHIAX6.
My Macan-S should have been delivered to the dealership on 3/6/22, but after sitting in the Porsche compound in Leipzig for twelve days was selected “for further quality checks” according to the SE. It is now due at the dealership around 17/6/22. Deposit on the car was paid mid-September. Configuration PNTHIAX6.
-
- Similar Topics
- Replies
- Views
- Last post
-
- 20 Replies
- 3857 Views
-
Last post by PJV997
-
- 94 Replies
- 7140 Views
-
Last post by Monaco2323
-
- 10 Replies
- 2729 Views
-
Last post by Tracky
-
- 3 Replies
- 1162 Views
-
Last post by timthetinyhorse
-
- 272 Replies
- 81674 Views
-
Last post by r1flyguy