Build allocations only

All your ordering information here!
Old Chimer
Posts: 319
Joined: Mon Oct 18, 2021 9:42 am

Post by Old Chimer » Sun May 22, 2022 12:05 pm

Duplicate deleted
Last edited by Old Chimer on Sun May 22, 2022 1:09 pm, edited 1 time in total.
'22 Macan S, GB, 14W/XL, AAS, PA/SV, ACC, LCA, PG, HF/RS, VFS, EETS, 75L, etc, etc.

User avatar
Wing Commander
Posts: 16891
Joined: Tue Oct 06, 2015 5:43 pm
Location: Swindon

Post by Wing Commander » Sun May 22, 2022 12:14 pm

Old Chimer wrote:
Sun May 22, 2022 12:05 pm
Looks like the next carrier due into Sheerness fromEmden is the Danube Highway on 26/05 followed by Elbe Highway on 02/06.

See http://www.kess.kline.de/data/files/105/HHSchedule.pdf

That will hopefully result in some smiley Macaneers in the near future. :)
Simon

Sold: 2016 Rhodium Silver Macan 2.0
Sold: 2013 Platinum Silver 911 (991.1) C2
Sold: 2017 Carmine Red Panamera 4
Mine: 991.2 Carrera T Racing Yellow http://www.porsche-code.com/PJCIIPK4

Old Chimer
Posts: 319
Joined: Mon Oct 18, 2021 9:42 am

Post by Old Chimer » Sun May 22, 2022 1:08 pm

Wing Commander wrote:
Sun May 22, 2022 12:14 pm
Old Chimer wrote:
Sun May 22, 2022 12:05 pm
Looks like the next carrier due into Sheerness fromEmden is the Danube Highway on 26/05 followed by Elbe Highway on 02/06.

See http://www.kess.kline.de/data/files/105/HHSchedule.pdf

That will hopefully result in some smiley Macaneers in the near future. :)
Me included 👍🏻 🤞
'22 Macan S, GB, 14W/XL, AAS, PA/SV, ACC, LCA, PG, HF/RS, VFS, EETS, 75L, etc, etc.

as7920
Posts: 111
Joined: Thu Mar 03, 2022 12:32 pm

Post by as7920 » Sun May 22, 2022 3:47 pm

Mine arrived on the Danube Highway too a week or so ago. Car still at Sheerness.

Apparently much of the PDI is performed there as with a number of VW/Audi group vehicles.

Old Chimer
Posts: 319
Joined: Mon Oct 18, 2021 9:42 am

Post by Old Chimer » Wed May 25, 2022 10:09 pm

Old Chimer wrote:
Sun May 22, 2022 12:05 pm
Looks like the next carrier due into Sheerness from Emden is the Danube Highway on 26/05 followed by Elbe Highway on 02/06.

See http://www.kess.kline.de/data/files/105/HHSchedule.pdf
UPDATE: Danube Highway now en route to Sheerness having slipped it's mooring at Emden early this afternoon, and the good news is that a second (larger) vehicle carrier, Parana, has just departed Emden this evening, also bound for Sheerness. Both due to arrive tomorrow.

Hoping for an update from SE tomorrow as to whether mine is on one of them 🤞
'22 Macan S, GB, 14W/XL, AAS, PA/SV, ACC, LCA, PG, HF/RS, VFS, EETS, 75L, etc, etc.

Bluesnose1812
Posts: 753
Joined: Sat Sep 18, 2021 1:16 pm
Location: Worcestershire

Post by Bluesnose1812 » Thu May 26, 2022 2:53 pm

Bad news from my SE. Cars are blocked at Sheerness and my ETA has been delayed for two weeks. They have 30 cars at the port waiting for delivery to Tewkesbury.
Ord 22.9.21 Landed18.6.22
Macan S|Jet Blk|Pano¦ WTrm |14 way¦Vntd¦Belts¦Crests|Air¦Chrono¦75L¦PwrStrng+|LamnAcouPrvcy Glss|Surr slf park|SLI ¦LCA¦ACC¦Ioniser|Heatd¦W/Scrn¦GT S/Whl|BOSE|18" Spare|Boot Mat| http://www.porsche-code.com/PNH4HVP5

as7920
Posts: 111
Joined: Thu Mar 03, 2022 12:32 pm

Post by as7920 » Thu May 26, 2022 3:34 pm

Bluesnose1812 wrote:
Thu May 26, 2022 2:53 pm
Bad news from my SE. Cars are blocked at Sheerness and my ETA has been delayed for two weeks. They have 30 cars at the port waiting for delivery to Tewkesbury.
Hmmm. My SE told me that was the case with mine over a week ago. Hope its not still the case for all cars.

Old Chimer
Posts: 319
Joined: Mon Oct 18, 2021 9:42 am

Post by Old Chimer » Thu May 26, 2022 4:15 pm

Might explain why the Parana is mooching along at circa 8 knots instead of 16.
'22 Macan S, GB, 14W/XL, AAS, PA/SV, ACC, LCA, PG, HF/RS, VFS, EETS, 75L, etc, etc.

Old Chimer
Posts: 319
Joined: Mon Oct 18, 2021 9:42 am

Post by Old Chimer » Thu May 26, 2022 6:47 pm

Bluesnose1812 wrote:
Thu May 26, 2022 2:53 pm
Bad news from my SE. Cars are blocked at Sheerness and my ETA has been delayed for two weeks. They have 30 cars at the port waiting for delivery to Tewkesbury.
Can't find anything online to explain this. Any idea what the 'blockage' is?

Meanwhile, Parana appears to be heading to an anchorage off Maidstone, so presumably no room to either dock or offlload at Sheerness. You really couldn't make it up, could you :cry:

Edited to add: Parana picking up speed again so maybe just an issue over timing of arrival for berth availability or tide time.

Edited to further add: Yes, I am a sad $*@#
Last edited by Old Chimer on Thu May 26, 2022 7:12 pm, edited 2 times in total.
'22 Macan S, GB, 14W/XL, AAS, PA/SV, ACC, LCA, PG, HF/RS, VFS, EETS, 75L, etc, etc.

PowerMalc
Posts: 76
Joined: Tue Feb 04, 2020 6:48 pm
Location: Stamford

Post by PowerMalc » Thu May 26, 2022 6:52 pm

Now had our allocation. Build date 31st August and lockdown 27th June. Anticipated delivery Mid September. Ordered 14th January
Will have to pay the new increased price but still getting the £360 'discount' for no electric steering column.
https://www.porsche.com/microsite/porsc ... =/PP1358N1
Macan S ordered 14-1-22 Gentian, Mojave, Walnut, Air, sunroof, 14 way, ACC, LCA, keyfree, surround, spare, HFW, PS+, PDLS+, Heated wheel, rear airbags, autodim, vented seats

Post Reply

  • Similar Topics
    Replies
    Views
    Last post