Build allocations only

All your ordering information here!
Post Reply
zuhair92
Posts: 54
Joined: Fri Oct 01, 2021 8:12 pm

Post by zuhair92 »

S
Deposit mid August 21
Build slot mid October
Stockport
Delivery any day now (waiting to hear back from SE)
First time Porsche customer, following dads foot steps after he got his 2021 992 GT3

Current: 2022 Macan S: http://www.porsche-code.com/PNPANU67

On order: 992 911 GTS: http://www.porschecode.com/PP1M4DU1

jonnydrama
Posts: 349
Joined: Fri Nov 16, 2018 8:27 pm

Post by jonnydrama »

sd1985 wrote: Tue Nov 30, 2021 9:05 am
jonnydrama wrote: Tue Nov 30, 2021 8:10 am
sd1985 wrote: Mon Nov 29, 2021 10:21 pm GTS
Deposit June 21
Aberdeen
Delivery this week
I was mid July and I'm apparently 4th on the list, was hoping I'd have locked in by now! How long did it take to come from lock in to delivery?
From when vehicle was fixed into production it’s just short of 2 months before it was ready for collection. I must have been 2nd/3rd on the list I’m guessing
Thank you, much appreciated. Look forward to seeing some pictures!
Eamondo
Posts: 13
Joined: Fri Dec 09, 2016 11:17 am

Post by Eamondo »

Macan S
Deposit Mid July
Perth
Sold previous Macan S in September
Told this week that OP is only getting 2 vehicles in Jan, Feb.
Hoping for more allocation mid Dec.
Originally speculated March 22
Deleted User 4494

Post by Deleted User 4494 »

S
Deposit paid April on Gen 2, switched order to Gen 3 S in June
Build date early November
Due in Colchester this Friday
JanW
Posts: 6
Joined: Tue Jun 08, 2021 9:27 pm

Post by JanW »

GTS
Deposit paid end May
Build date early November and I was told it was complete awaiting shipping
Due first week of December, then second week, then maybe end of December/ January so who knows!
Gibberish
Posts: 550
Joined: Mon Jan 04, 2021 5:30 pm

Post by Gibberish »

GTS
Deposit paid 29th August.
Was told early Q3 possibly Q2
Booked the demo out in 2 weeks and will hopefully find out more then.
🤞
Sold : 2012 981 Boxster S
Sold : 2016 981 Boxster Spyder
Sold: 2017 pdk 718 Cayman S
Sold : 2022 718 Cayman GTS 4.0 pdk PNPZ3NJ9
Sold : 2022 Macan GTS PP6I14Y4
Current: 2018 Gen2 Macan Base (hers)
Due 2023 718 Spyder PPFDEYX7
User avatar
Pivot
Posts: 1535
Joined: Sun Sep 09, 2018 7:41 pm

Post by Pivot »

718 Cayman GTS 4.0

Order/deposit July 2021
Allocation in Nov 21
Build slot Jan/Feb 22
Delivery Mar/Apr 22
Current: 911 Carrera T - PPM9RU51
On order: 911 Targa 4S - PPDV8NY4
Old Chimer
Posts: 440
Joined: Mon Oct 18, 2021 9:42 am

Post by Old Chimer »

What this thread has left me feeling is how apparently inequitable the ordering process is.
'22 Macan S, GB, 14W/XL, AAS, PA/SV, ACC, LCA, PG, HF/RS, VFS, EETS, 75L, etc, etc.
Bluesnose1812
Posts: 1628
Joined: Sat Sep 18, 2021 1:16 pm
Location: Worcestershire

Post by Bluesnose1812 »

Old Chimer wrote: Sun Dec 05, 2021 4:54 pm What this thread has left me feeling is how apparently inequitable the ordering process is.
Yes. If they can use JIT to build 1000 cars a day and a configurator that sucks probably an extra 10% in options, Then it should be simple to build a website that shows you exactly where your car is in the pipeline.
Currently
S|Leather|Air Susp|Chrono |Surround Camera|BOSE|14 way | AILPG |
http://www.porsche-code.com/PPSV6RD5
Next Project GTS March 2025
https://configurator.porsche.com/porsche-code/PR8DH6E6
Old Chimer
Posts: 440
Joined: Mon Oct 18, 2021 9:42 am

Post by Old Chimer »

Bluesnose1812 wrote: Sun Dec 05, 2021 4:59 pm
Old Chimer wrote: Sun Dec 05, 2021 4:54 pm What this thread has left me feeling is how apparently inequitable the ordering process is.
Yes. If they can use JIT to build 1000 cars a day and a configurator that sucks probably an extra 10% in options, Then it should be simple to build a website that shows you exactly where your car is in the pipeline.
It's the allocation of build dates that I'm struggling to understand. So many examples of posters having ordered at similar times getting build dates several months apart. I've watched the documentary of Macans being built and what is hugely impressive is the total flexibility to build pretty much any model/colour/spec in any order. This makes the disparity in build dates to order dates completely incomprehensible to my mind.
'22 Macan S, GB, 14W/XL, AAS, PA/SV, ACC, LCA, PG, HF/RS, VFS, EETS, 75L, etc, etc.
Post Reply

  • Similar Topics
    Replies
    Views
    Last post