Got a build slot!!

All your ordering information here!
chrisp86
Posts: 6
Joined: Thu Oct 14, 2021 8:49 am

Post by chrisp86 »

Hi All

I’ve been stalking the forum for a while checking out everyone’s spec’s and getting jealous of those who have taken delivery.

Got an email today with a lock in date of 3rd December for a March delivery.

Originally I’d gone for the 21” satin GT design wheels but these are no longer available so the dealer has swapped them for the 21” satin 5 spokes.

This is my current spec http://www.porsche-code.com/PNVUWM74

Any thoughts are greatly appreciated. The big one for me which I’m still undecided on is PSE. Thoughts??!

TheTraveller
Posts: 627
Joined: Fri Nov 02, 2018 9:30 pm
Location: South Yorkshire

Post by TheTraveller »

The 21inch 5 spoke will look brilliant, I think they fill the space beautifully. And they will be damn easy to clean.
Jon A
Posts: 4425
Joined: Tue Oct 19, 2021 7:26 pm

Post by Jon A »

How come so long between build and delivery? I only ask cos I got a build confirmation today for February delivery March??
718 Boxster - lava orange (2019)
992 C2 racing yellow (2020)
https://configurator.porsche.com/porsche-code/PRIMAJB4
Ex - Macan S - Carmine (2022)
http://www.porsche-code.com/PNZVYTE0
MikeM
Posts: 2252
Joined: Tue Nov 17, 2015 11:13 pm

Post by MikeM »

Nice spec Chris, Just some thoughts and purely my own opinion. Drop the BOSE add extended leather, for me too much black on sides, either body colour paint the sideblades or drop the black handles. Think about a spare wheel. PSE is nice sometimes, I actually turnoff when on motorways, I do like it on short runs with lots of gear changes but it’s not going to sound like a 911ever. It’s your car do what you want 👍
Previous Porsche’s
2008. 987 Boxster S Sport basalt
2012. 991 Carrera S aqua
2016. Macan Turbo volcano
Current
2020. Macan GTS crayon
2024. Macan GTS gentian. Delivery update mid May https://configurator.porsche.com/porsche-code/PR8H7WC6
Deleted User 4436

Post by Deleted User 4436 »

Jon A wrote: Mon Nov 08, 2021 6:15 pm How come so long between build and delivery? I only ask cos I got a build confirmation today for February delivery March??
There “should” be a gap of between 1 and 3 weeks. However, just at the moment it appears cars are rolling off the production line with bits missing that then have to be manually retrofitted before the cars can be shipped and that seems to add at least a month.
User avatar
pmg
Posts: 2989
Joined: Wed Jun 20, 2018 7:31 pm

Post by pmg »

Jon A wrote: Mon Nov 08, 2021 6:15 pm How come so long between build and delivery? I only ask cos I got a build confirmation today for February delivery March??
Normally between 2 and 6 weeks, the big variable is how long the vehicle sits on the dock at Emden waiting for a boat to Sheerness (Southern dealers) or Grimsby( Northern Dealers). however, at present some cars are being built with bits missing and having a further delay in a compound at Leipzig till the missing bits arrive and fitted
2019 Macan S Porsche code PKW8WKI8
Jon A
Posts: 4425
Joined: Tue Oct 19, 2021 7:26 pm

Post by Jon A »

Makes sense but he is being advised of a three month delay, two months before it gets built!
Does this mean that the delays are now automatically built in because they know they won’t be able to deliver for want of parts way into the future…
718 Boxster - lava orange (2019)
992 C2 racing yellow (2020)
https://configurator.porsche.com/porsche-code/PRIMAJB4
Ex - Macan S - Carmine (2022)
http://www.porsche-code.com/PNZVYTE0
Tracky
Posts: 4249
Joined: Fri Feb 22, 2019 10:26 pm

Post by Tracky »

Shame to lose the GT wheels, they were the beast

If you are putting the sports pipes on you may as go the whole hog on PSE
On order

GT4 RS

Current

992 S
Macan.2 S
928S4
Modified Lotus Exige V6
Seat Ibiza 1.0 (115ps) DSG Excellence Lux(dog’s!)
Jag Mk2 3.4

Ex

981 Boxster S
Deleted User 4436

Post by Deleted User 4436 »

Jon A wrote: Mon Nov 08, 2021 8:06 pm Makes sense but he is being advised of a three month delay, two months before it gets built!
Does this mean that the delays are now automatically built in because they know they won’t be able to deliver for want of parts way into the future…
I’ve seen reports of the VAG saying the parts shortage shouldn’t be an issue past Q1 of next year ( which seems unlikely), but who knows.
User avatar
Nuclear Nick
Posts: 3816
Joined: Wed Feb 17, 2016 3:42 pm
Location: Bristol

Post by Nuclear Nick »

Jon A wrote: Mon Nov 08, 2021 8:06 pm Makes sense but he is being advised of a three month delay, two months before it gets built!
Does this mean that the delays are now automatically built in because they know they won’t be able to deliver for want of parts way into the future…
Not necessarily that long a delay. Lockdown date is usually six weeks before build, meaning in this case the car being built in mid January. If the vehicle is handed over on 1st March that would be five or six weeks between build and handover, which is not abnormal.
Nick

Defender 90 V8

991.2 C2 GTS

Macan Turbo - sold

BMW K1300S, BMW R1250 GSA